Quiz-summary
0 of 9 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
Information
Premium Practice Questions
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
0 of 9 questions answered correctly
Your time:
Time has elapsed
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- Answered
- Review
-
Question 1 of 9
1. Question
What distinguishes Commissioning Documentation Review and Approval from related concepts for ACG Certified Commissioning Technician (CxT) when evaluating the final submittal package for a complex chilled water system? A technician is tasked with reviewing the Operations and Maintenance (O&M) manuals and the contractor’s completed Pre-Functional Checklists (PFCs) before the project moves into the Functional Performance Testing (FPT) phase.
Correct
Correct: Commissioning documentation review is a technical quality assurance task. For a CxT, this means ensuring that the O&M manuals and PFCs are not just generic documents, but are tailored to the specific installation and the goals outlined in the Owner’s Project Requirements (OPR) and Basis of Design (BOD). This ensures the operations staff has the specific information needed to maintain the system as intended by the design and the owner.
Incorrect: The administrative logging of documents is a project management function, not a technical commissioning review. Performing a peer review of engineering load calculations is the responsibility of a design professional or a senior commissioning authority, not the standard role of a CxT during documentation review. Checking OSHA training logs is a safety and risk management function that falls outside the scope of technical commissioning documentation review, which focuses on system performance and maintainability.
Takeaway: Technical documentation review in commissioning ensures that project-specific operational and maintenance data aligns with the owner’s requirements rather than just meeting administrative filing needs.
Incorrect
Correct: Commissioning documentation review is a technical quality assurance task. For a CxT, this means ensuring that the O&M manuals and PFCs are not just generic documents, but are tailored to the specific installation and the goals outlined in the Owner’s Project Requirements (OPR) and Basis of Design (BOD). This ensures the operations staff has the specific information needed to maintain the system as intended by the design and the owner.
Incorrect: The administrative logging of documents is a project management function, not a technical commissioning review. Performing a peer review of engineering load calculations is the responsibility of a design professional or a senior commissioning authority, not the standard role of a CxT during documentation review. Checking OSHA training logs is a safety and risk management function that falls outside the scope of technical commissioning documentation review, which focuses on system performance and maintainability.
Takeaway: Technical documentation review in commissioning ensures that project-specific operational and maintenance data aligns with the owner’s requirements rather than just meeting administrative filing needs.
-
Question 2 of 9
2. Question
As the MLRO at a private bank, you are reviewing Review of Design Documents for Commissionability during transaction monitoring when an incident report arrives on your desk. It reveals that the 95% design submission for a complex laboratory ventilation system lacks specified locations for test ports and thermal wells on the chilled water branches serving the high-precision cooling coils. Given the project’s requirement for rigorous Functional Performance Testing (FPT), what is the most significant risk identified during this design review phase?
Correct
Correct: The primary goal of a commissionability review is to ensure that the design includes the necessary physical provisions to allow for testing, adjusting, and balancing. Without test ports and thermal wells, the Commissioning Technician cannot measure the temperature and pressure differentials required to calculate heat transfer or verify that the system meets the Owner’s Project Requirements (OPR). Identifying this at the design stage prevents the need for cutting into piping or adding fittings after the system is installed.
Incorrect: The other options represent different types of project risks but do not address commissionability. Compliance with insulation thickness is a code and design issue, not a testing access issue. Pump efficiency is a performance and selection concern that does not necessarily prevent the act of commissioning. Procurement delays are a project management and scheduling risk rather than a technical design deficiency affecting the ability to perform functional tests.
Takeaway: A commissionability review must confirm that the design provides the physical access and instrumentation points necessary to perform non-invasive functional performance testing and verification.
Incorrect
Correct: The primary goal of a commissionability review is to ensure that the design includes the necessary physical provisions to allow for testing, adjusting, and balancing. Without test ports and thermal wells, the Commissioning Technician cannot measure the temperature and pressure differentials required to calculate heat transfer or verify that the system meets the Owner’s Project Requirements (OPR). Identifying this at the design stage prevents the need for cutting into piping or adding fittings after the system is installed.
Incorrect: The other options represent different types of project risks but do not address commissionability. Compliance with insulation thickness is a code and design issue, not a testing access issue. Pump efficiency is a performance and selection concern that does not necessarily prevent the act of commissioning. Procurement delays are a project management and scheduling risk rather than a technical design deficiency affecting the ability to perform functional tests.
Takeaway: A commissionability review must confirm that the design provides the physical access and instrumentation points necessary to perform non-invasive functional performance testing and verification.
-
Question 3 of 9
3. Question
A new business initiative at a credit union requires guidance on Commissioning of Laboratory Fume Hoods and Exhaust Systems as part of whistleblowing. The proposal raises questions about the technical adequacy of the safety controls in a specialized testing facility. During the Functional Performance Testing (FPT) phase, the Commissioning Technician (CxT) observes that the fume hood face velocity significantly deviates from the setpoint for approximately 8 seconds whenever the laboratory entry door is cycled. Which action should the CxT take to address this risk to laboratory containment?
Correct
Correct: In Variable Air Volume (VAV) laboratory systems, maintaining containment depends on the speed at which the airflow control system (air valves and controllers) can react to changes in room pressure or sash position. A significant drop in face velocity when a door is opened indicates that the supply and exhaust air valves are not tracking each other quickly enough to maintain the required room pressure offset. The Commissioning Technician must ensure the system responds within the industry-standard timeframe (typically under 3 to 5 seconds) to prevent hazardous vapors from escaping the hood during these transient events.
Incorrect: Increasing the deadband for the alarm (option b) is a safety violation as it merely hides the symptom of containment loss rather than fixing the underlying control failure. Increasing the static pressure setpoint (option c) is an energy-inefficient measure that does not address the dynamic response time of the individual air valves. Re-verifying the sash position sensor (option d) is incorrect because the scenario specifies the disturbance is caused by the laboratory door movement, which affects room pressure, rather than the movement of the fume hood sash itself.
Takeaway: Commissioning of VAV laboratory systems must prioritize the verification of rapid control response times to ensure that transient events like door openings do not compromise fume hood containment.
Incorrect
Correct: In Variable Air Volume (VAV) laboratory systems, maintaining containment depends on the speed at which the airflow control system (air valves and controllers) can react to changes in room pressure or sash position. A significant drop in face velocity when a door is opened indicates that the supply and exhaust air valves are not tracking each other quickly enough to maintain the required room pressure offset. The Commissioning Technician must ensure the system responds within the industry-standard timeframe (typically under 3 to 5 seconds) to prevent hazardous vapors from escaping the hood during these transient events.
Incorrect: Increasing the deadband for the alarm (option b) is a safety violation as it merely hides the symptom of containment loss rather than fixing the underlying control failure. Increasing the static pressure setpoint (option c) is an energy-inefficient measure that does not address the dynamic response time of the individual air valves. Re-verifying the sash position sensor (option d) is incorrect because the scenario specifies the disturbance is caused by the laboratory door movement, which affects room pressure, rather than the movement of the fume hood sash itself.
Takeaway: Commissioning of VAV laboratory systems must prioritize the verification of rapid control response times to ensure that transient events like door openings do not compromise fume hood containment.
-
Question 4 of 9
4. Question
Which preventive measure is most critical when handling Review of Design Documents for Commissionability? A commissioning technician is evaluating the 90% design submission for a complex laboratory facility. The project involves high-performance air handling units and integrated laboratory exhaust systems. During the review, the technician must ensure that the design allows for the successful execution of the commissioning plan and future maintenance activities.
Correct
Correct: Commissionability refers to the ease with which a system can be commissioned, tested, and maintained. The most critical preventive measure during a design review is ensuring that the physical design includes the necessary infrastructure for testing, such as test ports for air and water flow measurements, and sufficient clearance for technicians to access dampers, valves, and sensors. Without these elements, functional performance testing (FPT) cannot be accurately or safely performed, leading to delays and potential system performance issues.
Incorrect: Specifying a single-source manufacturer is a procurement or design preference but does not inherently guarantee that a system is commissionable or accessible. Energy modeling software details are relevant to the design’s performance goals but do not address the practical ability to test the installed equipment. Subcontractor safety records and lists are administrative and safety management tasks that occur during the construction phase and do not impact the technical commissionability of the design documents.
Takeaway: A successful commissionability review focuses on ensuring the design provides the physical access and instrumentation necessary to verify system performance against the Owner’s Project Requirements (OPR).
Incorrect
Correct: Commissionability refers to the ease with which a system can be commissioned, tested, and maintained. The most critical preventive measure during a design review is ensuring that the physical design includes the necessary infrastructure for testing, such as test ports for air and water flow measurements, and sufficient clearance for technicians to access dampers, valves, and sensors. Without these elements, functional performance testing (FPT) cannot be accurately or safely performed, leading to delays and potential system performance issues.
Incorrect: Specifying a single-source manufacturer is a procurement or design preference but does not inherently guarantee that a system is commissionable or accessible. Energy modeling software details are relevant to the design’s performance goals but do not address the practical ability to test the installed equipment. Subcontractor safety records and lists are administrative and safety management tasks that occur during the construction phase and do not impact the technical commissionability of the design documents.
Takeaway: A successful commissionability review focuses on ensuring the design provides the physical access and instrumentation necessary to verify system performance against the Owner’s Project Requirements (OPR).
-
Question 5 of 9
5. Question
What best practice should guide the application of Commissioning of Lighting Controls during the functional performance testing phase of a new commercial office building to ensure long-term energy performance and occupant satisfaction?
Correct
Correct: Lighting controls, particularly occupancy sensors and daylighting systems, are highly sensitive to the physical environment. Furniture height, wall colors, and surface reflectivity significantly impact sensor performance and the accuracy of photocells. A best practice in commissioning is to perform functional testing once the space is in its final configuration to ensure the sequence of operations meets the design intent and energy codes under real-world conditions.
Incorrect: Relying on factory defaults is insufficient because every room geometry and usage pattern is unique, often leading to ‘false-ons’ or ‘false-offs’ if not adjusted. Testing only at night prevents the verification of daylight harvesting logic, which is a critical energy-saving feature that requires varying levels of ambient light to test dimming curves. Single-point measurements fail to account for the light gradient across a room, which is necessary to ensure uniform lighting levels and proper dimming response across different zones.
Takeaway: Effective lighting control commissioning requires verifying performance under realistic, final site conditions to ensure sensors interact correctly with the physical environment and daylighting strategies.
Incorrect
Correct: Lighting controls, particularly occupancy sensors and daylighting systems, are highly sensitive to the physical environment. Furniture height, wall colors, and surface reflectivity significantly impact sensor performance and the accuracy of photocells. A best practice in commissioning is to perform functional testing once the space is in its final configuration to ensure the sequence of operations meets the design intent and energy codes under real-world conditions.
Incorrect: Relying on factory defaults is insufficient because every room geometry and usage pattern is unique, often leading to ‘false-ons’ or ‘false-offs’ if not adjusted. Testing only at night prevents the verification of daylight harvesting logic, which is a critical energy-saving feature that requires varying levels of ambient light to test dimming curves. Single-point measurements fail to account for the light gradient across a room, which is necessary to ensure uniform lighting levels and proper dimming response across different zones.
Takeaway: Effective lighting control commissioning requires verifying performance under realistic, final site conditions to ensure sensors interact correctly with the physical environment and daylighting strategies.
-
Question 6 of 9
6. Question
The quality assurance team at a private bank identified a finding related to Post-Occupancy Commissioning and Performance Monitoring as part of conflicts of interest. The assessment reveals that the Commissioning Authority (CxA) is currently utilizing performance data dashboards provided by the mechanical contractor to evaluate system efficiency during the 12-month warranty period. Because the contractor is also responsible for performing any necessary repairs at their own expense, there is a risk that the data presented may be selectively filtered to hide intermittent equipment failures. To maintain the integrity of the commissioning process and ensure accurate performance monitoring, which action should the CxA prioritize?
Correct
Correct: In post-occupancy commissioning, the Commissioning Authority must ensure that performance monitoring is based on objective, unadulterated data. By accessing the Building Automation System (BAS) directly to pull trend logs, the CxA can perform independent verification of the contractor’s reports. This mitigates the conflict of interest where a contractor might be incentivized to under-report issues that would require costly warranty work, ensuring the owner receives an accurate assessment of building performance.
Incorrect: Relying on an affidavit is insufficient because it does not provide technical verification of the data and fails to address the underlying risk of data manipulation. Delegating to the IT department is inappropriate because IT staff typically lack the mechanical and HVAC expertise required to interpret commissioning data and identify operational deficiencies. Suspending monitoring is counterproductive, as the warranty period is the most critical time to identify and resolve performance issues at no cost to the owner; delaying this would result in the owner paying for repairs later.
Takeaway: Effective performance monitoring requires the Commissioning Authority to maintain independence by verifying system data through direct access to the Building Automation System rather than relying on third-party summaries.
Incorrect
Correct: In post-occupancy commissioning, the Commissioning Authority must ensure that performance monitoring is based on objective, unadulterated data. By accessing the Building Automation System (BAS) directly to pull trend logs, the CxA can perform independent verification of the contractor’s reports. This mitigates the conflict of interest where a contractor might be incentivized to under-report issues that would require costly warranty work, ensuring the owner receives an accurate assessment of building performance.
Incorrect: Relying on an affidavit is insufficient because it does not provide technical verification of the data and fails to address the underlying risk of data manipulation. Delegating to the IT department is inappropriate because IT staff typically lack the mechanical and HVAC expertise required to interpret commissioning data and identify operational deficiencies. Suspending monitoring is counterproductive, as the warranty period is the most critical time to identify and resolve performance issues at no cost to the owner; delaying this would result in the owner paying for repairs later.
Takeaway: Effective performance monitoring requires the Commissioning Authority to maintain independence by verifying system data through direct access to the Building Automation System rather than relying on third-party summaries.
-
Question 7 of 9
7. Question
Following a thematic review of Commissioning of Sprinkler Systems as part of change management, an insurer received feedback indicating that several fire protection system handovers lacked comprehensive documentation regarding integrated performance. During the commissioning of a new commercial facility’s wet-pipe sprinkler system, the Commissioning Technician (CxT) is preparing the Functional Performance Test (FPT) protocols. To ensure the system meets both NFPA standards and the Owner’s Project Requirements (OPR), which action should the CxT prioritize when verifying the water flow switch and tamper switch functionality?
Correct
Correct: Functional Performance Testing (FPT) focuses on the dynamic interaction of systems. Verifying that the fire alarm system (FAS) correctly identifies signals from the sprinkler system under emergency power conditions is a critical integrated systems test. This ensures that the life safety infrastructure remains operational during a power failure, fulfilling both NFPA requirements and the holistic goals of the commissioning process.
Incorrect: Conducting a hydrostatic pressure test is a standard installation requirement and part of the Pre-Functional Checklist (PFC) or construction quality control, rather than the integrated functional testing phase. Verifying sprinkler head spacing and spare head inventory are physical inspection tasks typically completed during the construction phase or as part of a final walkthrough. Validating main drain test results is a performance metric for the water supply, but it does not address the integrated communication between the fire protection and fire alarm systems which was the focus of the insurer’s feedback.
Takeaway: Functional Performance Testing for sprinkler systems must verify the reliable communication of alarm and supervisory signals to the fire alarm system under all potential operating conditions, including emergency power.
Incorrect
Correct: Functional Performance Testing (FPT) focuses on the dynamic interaction of systems. Verifying that the fire alarm system (FAS) correctly identifies signals from the sprinkler system under emergency power conditions is a critical integrated systems test. This ensures that the life safety infrastructure remains operational during a power failure, fulfilling both NFPA requirements and the holistic goals of the commissioning process.
Incorrect: Conducting a hydrostatic pressure test is a standard installation requirement and part of the Pre-Functional Checklist (PFC) or construction quality control, rather than the integrated functional testing phase. Verifying sprinkler head spacing and spare head inventory are physical inspection tasks typically completed during the construction phase or as part of a final walkthrough. Validating main drain test results is a performance metric for the water supply, but it does not address the integrated communication between the fire protection and fire alarm systems which was the focus of the insurer’s feedback.
Takeaway: Functional Performance Testing for sprinkler systems must verify the reliable communication of alarm and supervisory signals to the fire alarm system under all potential operating conditions, including emergency power.
-
Question 8 of 9
8. Question
What is the primary risk associated with Commissioning of Security Systems (e.g., Access Control, CCTV), and how should it be mitigated? During the final stages of a high-security facility project, the commissioning technician is evaluating the interface between the electronic access control system and the building fire alarm system. The design requires that all magnetic locks release upon a fire alarm signal to allow for unhindered egress.
Correct
Correct: The most critical risk in security system commissioning is the failure of the system to integrate correctly with life safety systems. Integrated Systems Testing (IST) is the specific commissioning phase designed to verify that cross-system logic—such as the fire alarm system triggering the release of security locks—functions reliably under emergency conditions. This ensures that security measures do not compromise life safety and egress requirements.
Incorrect: Signing off Pre-Functional Checklists (PFCs) is a quality control step for installation but does not mitigate the functional risk of system integration. While energy consumption and UPS load testing are part of electrical commissioning, they are secondary to the primary life safety and security functions of the system. Verifying DVR storage through a standalone Functional Performance Test (FPT) ensures the component works as specified but fails to address the high-level risk of inter-system communication failures between security and other building systems.
Takeaway: The primary focus of security system commissioning must be the verification of fail-safe integration with life safety systems through rigorous Integrated Systems Testing.
Incorrect
Correct: The most critical risk in security system commissioning is the failure of the system to integrate correctly with life safety systems. Integrated Systems Testing (IST) is the specific commissioning phase designed to verify that cross-system logic—such as the fire alarm system triggering the release of security locks—functions reliably under emergency conditions. This ensures that security measures do not compromise life safety and egress requirements.
Incorrect: Signing off Pre-Functional Checklists (PFCs) is a quality control step for installation but does not mitigate the functional risk of system integration. While energy consumption and UPS load testing are part of electrical commissioning, they are secondary to the primary life safety and security functions of the system. Verifying DVR storage through a standalone Functional Performance Test (FPT) ensures the component works as specified but fails to address the high-level risk of inter-system communication failures between security and other building systems.
Takeaway: The primary focus of security system commissioning must be the verification of fail-safe integration with life safety systems through rigorous Integrated Systems Testing.
-
Question 9 of 9
9. Question
Serving as relationship manager at an insurer, you are called to advise on Commissioning of Electrical Power Distribution Systems (e.g., Switchgear, Transformers, Panels) during client suitability. The briefing a control testing result highlights that during the Functional Performance Testing (FPT) of a new medium-voltage switchgear lineup, the ground fault protection system failed to trip within the specified time delay settings. The facility is scheduled for full occupancy in 14 days, and the electrical contractor suggests that the issue is likely a nuisance trip setting that can be adjusted post-occupancy. What is the most appropriate recommendation to ensure the integrity of the commissioning process and mitigate operational risk?
Correct
Correct: In the commissioning of electrical power distribution systems, safety and protection settings must be verified against the design intent, specifically the engineer’s coordination study. A failure to trip within specified parameters is a critical safety deficiency. The Commissioning Authority must ensure that any adjustments made to rectify a failure are followed by a successful re-test to confirm the system operates as intended before the system is accepted and the building is occupied.
Incorrect: Accepting verbal assurances or deferring critical safety tests to the warranty period fails to meet the fundamental goal of commissioning, which is to verify performance before occupancy. Liability waivers do not mitigate the physical risk of equipment damage or fire. Bypassing protection systems is a violation of safety codes and professional standards, significantly increasing the risk of catastrophic failure and loss of life.
Takeaway: Critical safety and protection systems in electrical distribution must be verified through re-testing after any adjustments to ensure compliance with the coordination study before system acceptance.
Incorrect
Correct: In the commissioning of electrical power distribution systems, safety and protection settings must be verified against the design intent, specifically the engineer’s coordination study. A failure to trip within specified parameters is a critical safety deficiency. The Commissioning Authority must ensure that any adjustments made to rectify a failure are followed by a successful re-test to confirm the system operates as intended before the system is accepted and the building is occupied.
Incorrect: Accepting verbal assurances or deferring critical safety tests to the warranty period fails to meet the fundamental goal of commissioning, which is to verify performance before occupancy. Liability waivers do not mitigate the physical risk of equipment damage or fire. Bypassing protection systems is a violation of safety codes and professional standards, significantly increasing the risk of catastrophic failure and loss of life.
Takeaway: Critical safety and protection systems in electrical distribution must be verified through re-testing after any adjustments to ensure compliance with the coordination study before system acceptance.