Quiz-summary
0 of 9 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
Information
Premium Practice Questions
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
0 of 9 questions answered correctly
Your time:
Time has elapsed
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- Answered
- Review
-
Question 1 of 9
1. Question
Serving as risk manager at a listed company, you are called to advise on Temperature and pressure relationships during model risk. The briefing a control testing result highlights that the automated safety protocols for a closed-loop thermal expansion tank failed to account for the pressure increase during a scheduled 48-hour high-heat sterilization cycle. The audit team notes that the system volume is fixed by the rigid piping and vessel walls. To mitigate the risk of a catastrophic rupture, the control model must be updated to reflect which specific physical relationship?
Correct
Correct: According to Gay-Lussac’s Law, for a given mass of gas at a constant volume, the pressure exerted by the gas is directly proportional to its absolute temperature. In a rigid piping system where the volume cannot change, any increase in temperature will result in a corresponding increase in pressure. From a risk management and control perspective, the model must accurately reflect this relationship to ensure safety relief valves and monitoring systems are set to trigger before the pipe’s burst pressure is reached.
Incorrect: The inverse relationship between pressure and volume (Boyle’s Law) is incorrect because it assumes temperature is constant and volume is the variable, which is not the case in a rigid system. The direct proportionality between volume and temperature (Charles’s Law) is incorrect because it assumes pressure is constant and the container can expand, which is physically impossible for rigid steel piping. The principle of partial pressures (Dalton’s Law) is incorrect as it describes the behavior of gas mixtures rather than the relationship between temperature and total pressure in a closed system.
Takeaway: In rigid, fixed-volume piping systems, auditors must ensure that risk models account for the direct proportionality of temperature and pressure to prevent over-pressurization and system failure.
Incorrect
Correct: According to Gay-Lussac’s Law, for a given mass of gas at a constant volume, the pressure exerted by the gas is directly proportional to its absolute temperature. In a rigid piping system where the volume cannot change, any increase in temperature will result in a corresponding increase in pressure. From a risk management and control perspective, the model must accurately reflect this relationship to ensure safety relief valves and monitoring systems are set to trigger before the pipe’s burst pressure is reached.
Incorrect: The inverse relationship between pressure and volume (Boyle’s Law) is incorrect because it assumes temperature is constant and volume is the variable, which is not the case in a rigid system. The direct proportionality between volume and temperature (Charles’s Law) is incorrect because it assumes pressure is constant and the container can expand, which is physically impossible for rigid steel piping. The principle of partial pressures (Dalton’s Law) is incorrect as it describes the behavior of gas mixtures rather than the relationship between temperature and total pressure in a closed system.
Takeaway: In rigid, fixed-volume piping systems, auditors must ensure that risk models account for the direct proportionality of temperature and pressure to prevent over-pressurization and system failure.
-
Question 2 of 9
2. Question
Working as the operations manager for a fund administrator, you encounter a situation involving Quality Assurance and Quality Control (QA/QC) during control testing. Upon examining an incident report, you discover that a series of Shielded Metal Arc Welding (SMAW) butt welds on a high-pressure steam system failed radiographic testing due to consistent slag inclusions. The project records indicate that the contractor’s Quality Control (QC) lead had performed visual inspections and cleared the joints for non-destructive examination (NDE). To evaluate the effectiveness of the quality management system, which of the following actions should be prioritized?
Correct
Correct: In a QA/QC framework, the primary control is ensuring that the personnel are qualified (WPQ) and that they are following a validated procedure (WPS) suitable for the specific task. Slag inclusions in SMAW are often a result of improper technique or using a procedure/position for which the welder is not qualified. Verifying these documents ensures the foundational controls of the quality system were active and appropriate for the scope of work.
Incorrect: Mandating a change in welding process is a technical directive that does not address the underlying failure of the existing quality control process. Increasing hydrostatic pressure is a validation of the final product’s strength but does not evaluate the quality management system or prevent future defects. Replacing the NDE technician assumes the inspection was the failure, whereas the presence of slag inclusions indicates a failure in the fabrication or the preliminary visual inspection process.
Takeaway: Effective QA/QC auditing requires verifying that technical procedures and personnel qualifications are correctly matched to the specific requirements of the fabrication task.
Incorrect
Correct: In a QA/QC framework, the primary control is ensuring that the personnel are qualified (WPQ) and that they are following a validated procedure (WPS) suitable for the specific task. Slag inclusions in SMAW are often a result of improper technique or using a procedure/position for which the welder is not qualified. Verifying these documents ensures the foundational controls of the quality system were active and appropriate for the scope of work.
Incorrect: Mandating a change in welding process is a technical directive that does not address the underlying failure of the existing quality control process. Increasing hydrostatic pressure is a validation of the final product’s strength but does not evaluate the quality management system or prevent future defects. Replacing the NDE technician assumes the inspection was the failure, whereas the presence of slag inclusions indicates a failure in the fabrication or the preliminary visual inspection process.
Takeaway: Effective QA/QC auditing requires verifying that technical procedures and personnel qualifications are correctly matched to the specific requirements of the fabrication task.
-
Question 3 of 9
3. Question
During a committee meeting at a listed company, a question arises about Diagnostic techniques for leaks, blockages, and pressure issues as part of data protection. The discussion reveals that a critical cooling line for the server farm has experienced a persistent 15% pressure drop over the last 48 hours. The internal audit team is evaluating the maintenance department’s proposed diagnostic plan to ensure minimal downtime and accurate identification of the root cause. Which diagnostic approach should the steamfitter recommend to precisely locate a suspected internal restriction while the system remains pressurized?
Correct
Correct: Ultrasonic flow meters allow for non-invasive measurement of fluid velocity, which will show a significant change at the point of a restriction. Infrared thermography complements this by identifying localized temperature changes (thermal gradients) caused by the pressure drop and flow turbulence at the site of a blockage, allowing for precise location without dismantling the system.
Incorrect: Pneumatic testing is primarily used for leak detection in new or modified systems and does not locate internal blockages. Dye penetrant testing is a non-destructive examination method for finding surface-breaking defects in welds, not internal flow restrictions. Chemical flushing is a remedial action rather than a diagnostic technique and may be ineffective if the nature of the blockage is mechanical or structural.
Takeaway: Non-invasive diagnostic tools like ultrasonic sensors and thermal imaging are the most effective methods for identifying internal flow restrictions in operational high-pressure systems without causing downtime.
Incorrect
Correct: Ultrasonic flow meters allow for non-invasive measurement of fluid velocity, which will show a significant change at the point of a restriction. Infrared thermography complements this by identifying localized temperature changes (thermal gradients) caused by the pressure drop and flow turbulence at the site of a blockage, allowing for precise location without dismantling the system.
Incorrect: Pneumatic testing is primarily used for leak detection in new or modified systems and does not locate internal blockages. Dye penetrant testing is a non-destructive examination method for finding surface-breaking defects in welds, not internal flow restrictions. Chemical flushing is a remedial action rather than a diagnostic technique and may be ineffective if the nature of the blockage is mechanical or structural.
Takeaway: Non-invasive diagnostic tools like ultrasonic sensors and thermal imaging are the most effective methods for identifying internal flow restrictions in operational high-pressure systems without causing downtime.
-
Question 4 of 9
4. Question
During a periodic assessment of Quality Assurance and Quality Control (QA/QC) as part of regulatory inspection at a fund administrator, auditors observed that the maintenance logs for a critical high-pressure steam header installation lacked documentation for electrode oven temperatures. Further investigation revealed that E7018 low-hydrogen electrodes were issued at the start of an 8-hour shift but were not returned to a holding oven during the mid-shift break. Given the high-pressure application and the risk of hydrogen-induced cracking, what is the most appropriate QA/QC response to ensure the integrity of the completed welds?
Correct
Correct: E7018 electrodes are low-hydrogen and highly hygroscopic, meaning they absorb moisture from the atmosphere. If they are left out of a controlled drying oven for longer than the time permitted by code (typically 4 hours), the moisture in the flux can introduce hydrogen into the weld pool, leading to delayed hydrogen-induced cracking (underbead cracking). Because this type of defect is often internal and not visible to the naked eye, non-destructive testing (NDT) is the only reliable way to ensure the structural integrity of the welds after a control failure has occurred.
Incorrect: Increasing preheat for future welds does not address the potential defects already present in the completed welds. Visual inspection is insufficient because hydrogen-induced cracking is often subsurface and may not manifest as surface porosity. Requesting a retroactive waiver is a violation of QA/QC protocols and safety standards, as a welder’s past performance does not mitigate the physical properties of contaminated filler metal.
Takeaway: Maintaining strict control over low-hydrogen electrode storage is essential to prevent internal weld defects like hydrogen-induced cracking in high-pressure piping systems.
Incorrect
Correct: E7018 electrodes are low-hydrogen and highly hygroscopic, meaning they absorb moisture from the atmosphere. If they are left out of a controlled drying oven for longer than the time permitted by code (typically 4 hours), the moisture in the flux can introduce hydrogen into the weld pool, leading to delayed hydrogen-induced cracking (underbead cracking). Because this type of defect is often internal and not visible to the naked eye, non-destructive testing (NDT) is the only reliable way to ensure the structural integrity of the welds after a control failure has occurred.
Incorrect: Increasing preheat for future welds does not address the potential defects already present in the completed welds. Visual inspection is insufficient because hydrogen-induced cracking is often subsurface and may not manifest as surface porosity. Requesting a retroactive waiver is a violation of QA/QC protocols and safety standards, as a welder’s past performance does not mitigate the physical properties of contaminated filler metal.
Takeaway: Maintaining strict control over low-hydrogen electrode storage is essential to prevent internal weld defects like hydrogen-induced cracking in high-pressure piping systems.
-
Question 5 of 9
5. Question
The compliance framework at a fund administrator is being updated to address Specialty coatings and linings as part of business continuity. A challenge arises because the internal audit team discovers that the quality control records for a newly installed glass-lined piping system do not include the spark test results required after the final assembly. The project manager argues that the visual inspection performed during the pipe fabrication phase is sufficient for the 10-year warranty period. From a risk management perspective, why is the omission of post-assembly spark testing a critical failure in the quality control of specialty-lined piping?
Correct
Correct: Spark testing (high-voltage leak detection) is the industry-standard method for identifying ‘holidays,’ which are microscopic gaps, pinholes, or discontinuities in a non-conductive lining. While a visual inspection might catch large chips, the mechanical stresses involved in the final assembly—such as torquing flanges or handling the pipe—can create hairline fractures or voids in brittle linings like glass. Without this test, the integrity of the corrosion barrier cannot be verified, posing a significant risk of premature pipe failure and business interruption.
Incorrect: Option B is incorrect because while linings have dielectric properties, spark testing is a quality control measure for integrity, not a calibration step for cathodic protection. Option C is incorrect because the Welding Procedure Specification (WPS) governs the metallic joining process, not the integrity of the internal specialty lining. Option D is incorrect because the pressure rating of a pipe is determined by the wall thickness and material of the outer metallic shell, not the results of a lining’s spark test.
Takeaway: Post-assembly spark testing is essential for specialty-lined piping to detect microscopic lining defects (holidays) that visual inspections cannot identify.
Incorrect
Correct: Spark testing (high-voltage leak detection) is the industry-standard method for identifying ‘holidays,’ which are microscopic gaps, pinholes, or discontinuities in a non-conductive lining. While a visual inspection might catch large chips, the mechanical stresses involved in the final assembly—such as torquing flanges or handling the pipe—can create hairline fractures or voids in brittle linings like glass. Without this test, the integrity of the corrosion barrier cannot be verified, posing a significant risk of premature pipe failure and business interruption.
Incorrect: Option B is incorrect because while linings have dielectric properties, spark testing is a quality control measure for integrity, not a calibration step for cathodic protection. Option C is incorrect because the Welding Procedure Specification (WPS) governs the metallic joining process, not the integrity of the internal specialty lining. Option D is incorrect because the pressure rating of a pipe is determined by the wall thickness and material of the outer metallic shell, not the results of a lining’s spark test.
Takeaway: Post-assembly spark testing is essential for specialty-lined piping to detect microscopic lining defects (holidays) that visual inspections cannot identify.
-
Question 6 of 9
6. Question
Which characterization of Final system acceptance criteria is most accurate for Steamfitter/Pipefitter (SP)? Following the completion of a high-pressure piping installation, the pipefitter must ensure the system meets all regulatory and project-specific requirements before it is commissioned for service.
Correct
Correct: Final system acceptance is a comprehensive process that ensures the structural and operational integrity of the piping system. This includes pressure testing (typically at a percentage above design pressure as per ASME codes), thorough documentation of weld quality through NDE (such as radiography or ultrasonic testing), and verifying that the physical support system is installed correctly to handle the stresses of thermal expansion and weight.
Incorrect: Focusing only on visual inspection and coatings is insufficient because it fails to verify the internal integrity of the welds or the system’s ability to hold pressure. While flushing and valve testing are important commissioning steps, they do not address the structural fabrication standards required for acceptance. Testing at operating pressure is incorrect as code-mandated pressure tests require higher pressures to ensure a safety margin, and verbal confirmations are not a substitute for formal, documented quality control records.
Takeaway: Final system acceptance requires a multi-faceted verification of structural integrity, weld quality documentation, and adherence to engineered support specifications.
Incorrect
Correct: Final system acceptance is a comprehensive process that ensures the structural and operational integrity of the piping system. This includes pressure testing (typically at a percentage above design pressure as per ASME codes), thorough documentation of weld quality through NDE (such as radiography or ultrasonic testing), and verifying that the physical support system is installed correctly to handle the stresses of thermal expansion and weight.
Incorrect: Focusing only on visual inspection and coatings is insufficient because it fails to verify the internal integrity of the welds or the system’s ability to hold pressure. While flushing and valve testing are important commissioning steps, they do not address the structural fabrication standards required for acceptance. Testing at operating pressure is incorrect as code-mandated pressure tests require higher pressures to ensure a safety margin, and verbal confirmations are not a substitute for formal, documented quality control records.
Takeaway: Final system acceptance requires a multi-faceted verification of structural integrity, weld quality documentation, and adherence to engineered support specifications.
-
Question 7 of 9
7. Question
What best practice should guide the application of Piping System Maintenance and Troubleshooting? A facility’s maintenance records indicate that a specific high-pressure steam header has required three weld repairs in the same location over a two-year period. To demonstrate professional judgment in troubleshooting, which investigative step should be prioritized to mitigate the risk of a catastrophic system failure?
Correct
Correct: Professional troubleshooting of recurring failures in high-pressure piping requires a root cause analysis that extends beyond the point of failure. In steam systems, recurring cracks are frequently caused by thermal expansion stresses that are not properly managed due to failed or improperly adjusted supports and anchors. Evaluating these system-wide factors is the best practice for ensuring a permanent repair and maintaining system safety.
Incorrect
Correct: Professional troubleshooting of recurring failures in high-pressure piping requires a root cause analysis that extends beyond the point of failure. In steam systems, recurring cracks are frequently caused by thermal expansion stresses that are not properly managed due to failed or improperly adjusted supports and anchors. Evaluating these system-wide factors is the best practice for ensuring a permanent repair and maintaining system safety.
-
Question 8 of 9
8. Question
A client relationship manager at an investment firm seeks guidance on System head and pump curves as part of internal audit remediation. They explain that a facility’s cooling system is failing to meet performance benchmarks established in the 2023 maintenance audit. The manager notes that while the pump was selected based on its maximum head capacity, the actual flow measured at the cooling towers is insufficient. They are concerned that the system resistance was underestimated during the piping layout phase. In the context of evaluating system performance, which principle correctly identifies how the system head curve interacts with the pump curve?
Correct
Correct: The operating point of a hydronic system is the specific flow rate and head where the pump’s performance curve (what the pump can provide) and the system head curve (what the system requires to overcome friction and static head) intersect. At this point, the energy supplied by the pump exactly matches the energy consumed by the system’s resistance.
Incorrect: Option B is incorrect because the system head curve is not constant; it increases parabolically as flow increases due to friction. Option C is incorrect because decreasing pipe roughness or increasing diameter reduces friction, which would shift the system head curve downward, not upward. Option D is incorrect because the pump curve is an inherent characteristic of the pump’s design and impeller size; it is the system curve that changes based on the piping configuration, not the pump’s performance curve itself.
Takeaway: The actual performance of a pumping system is determined by the intersection of the pump’s performance curve and the system’s resistance curve.
Incorrect
Correct: The operating point of a hydronic system is the specific flow rate and head where the pump’s performance curve (what the pump can provide) and the system head curve (what the system requires to overcome friction and static head) intersect. At this point, the energy supplied by the pump exactly matches the energy consumed by the system’s resistance.
Incorrect: Option B is incorrect because the system head curve is not constant; it increases parabolically as flow increases due to friction. Option C is incorrect because decreasing pipe roughness or increasing diameter reduces friction, which would shift the system head curve downward, not upward. Option D is incorrect because the pump curve is an inherent characteristic of the pump’s design and impeller size; it is the system curve that changes based on the piping configuration, not the pump’s performance curve itself.
Takeaway: The actual performance of a pumping system is determined by the intersection of the pump’s performance curve and the system’s resistance curve.
-
Question 9 of 9
9. Question
The monitoring system at a private bank has flagged an anomaly related to Advanced welding techniques for exotic materials during onboarding. Investigation reveals that a specialized piping contractor, undergoing a risk assessment for a high-value infrastructure project, lacks specific procedural documentation for the Gas Tungsten Arc Welding (GTAW) of titanium alloys. The auditor notes that the current quality control manual does not specify the requirements for protecting the weld from atmospheric contamination during the cooling phase. Which technical requirement is most critical for the auditor to verify to ensure the metallurgical integrity of the titanium root pass?
Correct
Correct: Reactive exotic materials, such as titanium, are highly susceptible to embrittlement and contamination if exposed to oxygen, nitrogen, or hydrogen at temperatures above 800°F (427°C). To ensure a sound weld, it is mandatory to use an inert gas (typically high-purity argon) to shield the face of the weld using a trailing shield and the back of the weld using a back-purge. This protection must be maintained until the metal has cooled below the critical oxidation temperature to prevent ‘sugaring’ or discoloration that indicates material degradation.
Incorrect: While high-frequency starts are important for preventing tungsten contamination in GTAW, they do not address the primary risk of atmospheric oxidation in exotic materials. Deoxidizing fluxes are commonly used in other welding processes but are not a substitute for inert gas shielding in high-purity titanium GTAW. Transitioning to GMAW spray transfer might increase deposition rates, but it does not provide the necessary atmospheric control required for reactive metals and is generally less precise than GTAW for root passes in exotic piping.
Takeaway: Welding reactive exotic metals requires total atmospheric isolation through continuous inert gas purging and trailing shields to prevent embrittlement and ensure structural integrity.
Incorrect
Correct: Reactive exotic materials, such as titanium, are highly susceptible to embrittlement and contamination if exposed to oxygen, nitrogen, or hydrogen at temperatures above 800°F (427°C). To ensure a sound weld, it is mandatory to use an inert gas (typically high-purity argon) to shield the face of the weld using a trailing shield and the back of the weld using a back-purge. This protection must be maintained until the metal has cooled below the critical oxidation temperature to prevent ‘sugaring’ or discoloration that indicates material degradation.
Incorrect: While high-frequency starts are important for preventing tungsten contamination in GTAW, they do not address the primary risk of atmospheric oxidation in exotic materials. Deoxidizing fluxes are commonly used in other welding processes but are not a substitute for inert gas shielding in high-purity titanium GTAW. Transitioning to GMAW spray transfer might increase deposition rates, but it does not provide the necessary atmospheric control required for reactive metals and is generally less precise than GTAW for root passes in exotic piping.
Takeaway: Welding reactive exotic metals requires total atmospheric isolation through continuous inert gas purging and trailing shields to prevent embrittlement and ensure structural integrity.